Detailed design to connect Customer BESS (Battery Energy Storage System) to the tertiary connection of the existing 400/132/33kV SGT at a National Grid Substation. The tertiary connection scheme consists of connection asset works and user works to enable export and import of power to the BESS site, and vice versa.
Challenge & Solution
- Civil Design
- HV Plant Design
- Protection and Control Design
- Principal Designer Representative
- Earthing Studies
Project Information
Client:
National Grid