Detailed Design
33/13kV Tertiary Connection Project for at 400kV Bramley

Detailed design to connect Customer BESS (Battery Energy Storage System) to the tertiary connection of the existing 400/132/33kV SGT at a National Grid Substation. The tertiary connection scheme consists of connection asset works and user works to enable export and import of power to the BESS site, and vice versa.

Challenge & Solution

  • Civil Design
  • HV Plant Design
  • Protection and Control Design
  • Principal Designer Representative
  • Earthing Studies

Project Information

Client:

National Grid